Production orders and costing

Plan what to make, consume the components, receive the finished goods and see what each unit cost.

Open this area in your workspace

Plan a production order

A production order says what to make, how many, in which warehouse and by when. Orders are numbered MO-0001, MO-0002 and so on, and use the item’s default bill of materials unless you pick another. Production orders come with the Make and Custom plans.

Make to stock when you build up finished goods ahead of demand. Make to order when a customer has already ordered: link the production order to the sales order, and the finished goods are there for that order’s delivery.

From draft to done

  1. Draft: the order is being planned. Nothing is committed and no stock moves.
  2. Confirmed: the order is part of the plan. Check that the components are in the warehouse before you start.
  3. In progress: part of the quantity has been produced. Record each batch as you finish it.
  4. Done: the full quantity has been produced.
  5. Cancelled: the order won’t be made. Production already recorded stays in the stock ledger.

Record what you made

Each time you finish a batch, record the quantity made. Each run posts one stock document: the components leave stock as consumed, and the finished goods and any by-products arrive. You can record several runs against one order, for example 8 desks on Sunday and 12 on Tuesday.

Stock can’t go below zero unless your workspace allows negative stock, so a run stops if a component is short. If a component is tracked by lot, choose the lots used. If the finished item is tracked by lot, give the run a lot code and, where it applies, an expiry date.

What a unit really cost

Production costing uses what was actually consumed, at its stock cost: average cost by default, or the oldest cost layers first if your workspace uses FIFO. If 20 desks consumed EGP 46,000 of materials, each desk cost EGP 2,300. When a by-product carries a share of the run’s cost, the finished goods carry the rest.

The cost covers materials. Labour and overheads aren’t added to stock value, so price them into your selling price.

What you see depends on your plan, the features your workspace has switched on and your access. If a screen in this guide is missing, ask your workspace owner.